Description

Model Number: WBS1585R

Introducing the Nuie 1500mm x 850mm Right Hand Square Shower Bath, a stylish and practical addition to any modern bathroom. Designed for versatility, this shower bath seamlessly combines relaxation and functionality, making it ideal for those who desire both a refreshing shower experience and a tranquil bath soak. With its contemporary square shape and crisp white finish, the WBS1585R adds a touch of elegance to your bathing space.

This spacious shower bath features a generous capacity of 200 litres, ensuring you have ample water for your desired bathing experience. The right-hand orientation provides easy access for users, while the 390mm depth offers a comfortable bathing experience. Crafted from high-quality plastic, the WBS1585R is designed to withstand everyday use while maintaining its sleek appearance. The glossy finish not only enhances its aesthetic appeal but also makes it easy to clean, keeping your bathroom looking pristine.

The WBS1585R is also designed with practicality in mind, featuring an integrated bath overflow and an end waste location for efficient drainage. Its compatibility with standard bath pillar taps allows you to easily choose your preferred tap style to complement your bathroom decor. Although bath taps and waste are sold separately, the provision of bath legs ensures that installation is straightforward and secure. Plus, with a 5-year guarantee, you can trust in the quality and durability of this shower bath.

Key Features:

  • Modern square shape for contemporary aesthetics
  • Generous 200L capacity for an enjoyable bath experience
  • High-quality plastic construction with a gloss finish
  • Right-hand orientation for easy access
  • Integrated overflow and end waste location
  • Compatible with standard bath pillar taps
  • 5-year guarantee for peace of mind

Product Notes:

  • Bath taps and waste sold separately unless specified.

Specifications

width 855mm
depth 400mm
anti slip No
bath capacity volume 200L
bath depth 390mm
bath grips No
bath legs required Yes
bath legs supplied Yes
bath panels required Yes
bath panels supplied No
bath taps supplied No
bath thickness 4mm
bath type Shower Bath
bath waste location End
bath waste supplied No
bath waste type required Standard
compatible bath tap type Bath Pillar Taps
item colour White
item guarantee 5 Years
item material Acrylic
item mounting method Screws, Sealant and Plumbing
item mounting type Floor Mounted
item shape Square
item style Modern
item weight 19.2kg
shower screen required No
shower screen supplied No
length 1500mm
item finish Gloss
item orientation Right Hand
item depth 400mm

Nuie 1500mm x 850mm Right Hand Square Shower Bath - WBS1585R

£267.90
Dispatching from 4th Nov 2026
Buy now, pay later
Adding To Basket… The item has been added

* Pre-order - this item will ship when in stock